A kitchen renovation touches almost every trade: demolition, framing, plumbing, electrical, cabinetry, counters, tile, flooring and paint. Good planning is what keeps it on budget and on schedule. Here is the order we recommend working through the decisions.
1. Start with layout and workflow
Decide whether you are keeping the existing layout or changing it. Moving the sink, range or fridge adds plumbing, gas or electrical work but can transform how the kitchen works. Think about the path between fridge, sink and cooktop, where people gather, and whether an island or peninsula fits comfortably.
2. Open concept or not
Removing a wall to open the kitchen to the living space is one of the most requested changes. Some walls are load-bearing or carry ducts, pipes or wiring, so it needs to be assessed properly and may need a beam and a permit.
3. Cabinets and storage
Cabinets drive a large share of the budget and most of the look. Plan storage around how you cook: deep drawers for pots, a pantry, a spot for small appliances, and a proper place for recycling and garbage.
4. Counters and backsplash
Quartz is popular for durability and low maintenance. Whatever you choose, counters are templated after the cabinets are installed, so they set part of the timeline.
5. Lighting and power
Combine general lighting, under-cabinet task lighting and a feature fixture over the island. Plan outlets for the island and any appliance garage, and check whether your panel can handle new appliances.
6. Budget and timeline
Cost depends on size, layout changes, cabinet quality and finishes. Get an itemized quote, keep a contingency for surprises behind the walls, and order long-lead items early. Ask your contractor how you will cook and live during the work.
Planning a kitchen renovation?
FM Contracting has renovated kitchens in condos, custom homes and family homes across Mississauga and the GTA since 2006, with a 2-year warranty on all work. Request a quote or call 416-816-2137.